<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Archiving and Interchange DTD with OASIS Tables with MathML3 v1.4 20220324//EN" "JATS-archive-oasis-tables-mathml3.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xml:lang="en" dtd-version="1.4" article-type="research-article">
  <front>
    <journal-meta>
      <journal-id journal-id-type="eissn">2588-0101</journal-id>
      <journal-title-group>
        <journal-title xml:lang="ru">Вестник Евразийской науки</journal-title>
        <journal-title xml:lang="en">The Eurasian Scientific Journal</journal-title>
      </journal-title-group>
      <publisher>
        <publisher-name>ООО «Издательство «Мир науки»</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="uri">https://esj.today/33SAVN126.html</article-id>
      <title-group>
        <article-title xml:lang="ru">Синхронизация данных использования
машин и механизмов на примере автоматизированного создания 4D-модели</article-title>
        <trans-title-group xml:lang="en">
          <trans-title>Synchronization of data on the use
of machines and mechanisms using the example
of automated 4D model creation</trans-title>
        </trans-title-group>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <name name-style="eastern">
            <surname>Эльмурзаев</surname>
            <given-names>Магомед Аюбович</given-names>
          </name>
          <name-alternatives>
            <name xml:lang="ru" name-style="eastern">
              <surname>Эльмурзаев</surname>
              <given-names>Магомед Аюбович</given-names>
            </name>
            <name xml:lang="en" name-style="western">
              <surname>Elmurzaev</surname>
              <given-names>Magomed Ayubovich</given-names>
            </name>
          </name-alternatives>
          <email>elmurzaevmagamed-ali@mail.ru</email>
          <contrib-id contrib-id-type="orcid">https://orcid.org/0009-0005-3163-0106</contrib-id>
          <xref ref-type="aff" rid="aff1"/>
        </contrib>
        <contrib contrib-type="author">
          <name name-style="eastern">
            <surname>Алиев</surname>
            <given-names>Саламбек Алимбекович</given-names>
          </name>
          <name-alternatives>
            <name xml:lang="ru" name-style="eastern">
              <surname>Алиев</surname>
              <given-names>Саламбек Алимбекович</given-names>
            </name>
            <name xml:lang="en" name-style="western">
              <surname>Aliev</surname>
              <given-names>Salambek Alimbekovich</given-names>
            </name>
          </name-alternatives>
          <email>asa-fenix@mail.ru</email>
          <contrib-id contrib-id-type="orcid">https://orcid.org/0000-0003-4341-4409</contrib-id>
          <xref ref-type="aff" rid="aff1"/>
        </contrib>
        <contrib contrib-type="author">
          <name name-style="eastern">
            <surname>Муртазаев</surname>
            <given-names>Имран Саид-Альвиевич</given-names>
          </name>
          <name-alternatives>
            <name xml:lang="ru" name-style="eastern">
              <surname>Муртазаев</surname>
              <given-names>Имран Саид-Альвиевич</given-names>
            </name>
            <name xml:lang="en" name-style="western">
              <surname>Murtazaev</surname>
              <given-names>Imran Said-Alvievich</given-names>
            </name>
          </name-alternatives>
          <email>pirlo.21.milan@mail.ru</email>
          <contrib-id contrib-id-type="orcid">https://orcid.org/0000-0001-9242-2953</contrib-id>
          <xref ref-type="aff" rid="aff2"/>
        </contrib>
        <contrib contrib-type="author">
          <name name-style="eastern">
            <surname>Умархаджиев</surname>
            <given-names>Салаудин Мусаевич</given-names>
          </name>
          <name-alternatives>
            <name xml:lang="ru" name-style="eastern">
              <surname>Умархаджиев</surname>
              <given-names>Салаудин Мусаевич</given-names>
            </name>
            <name xml:lang="en" name-style="western">
              <surname>Umarkhadzhiev</surname>
              <given-names>Salaudin Musaevich</given-names>
            </name>
          </name-alternatives>
          <email>usmu@mail.ru</email>
          <contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-8283-1515</contrib-id>
          <xref ref-type="aff" rid="aff1"/>
        </contrib>
        <aff-alternatives id="aff1">
          <aff>
            <institution xml:lang="ru">ФГБУН «Комплексный научно-исследовательский институт имени Х.И. Ибрагимова Российской академии наук» (Грозный, Россия)</institution>
          </aff>
          <aff>
            <institution xml:lang="en">Complex Research Institute named after Kh.I. Ibragimov of the Russian Academy of Sciences (Grozny, Russia)</institution>
          </aff>
        </aff-alternatives>
        <aff-alternatives id="aff2">
          <aff>
            <institution xml:lang="ru">ФГБОУ ВО «Национальный исследовательский Московский государственный строительный университет» (Москва, Россия)</institution>
          </aff>
          <aff>
            <institution xml:lang="en">National Research Moscow State University of Civil Engineering (Moscow, Russia)</institution>
          </aff>
        </aff-alternatives>
      </contrib-group>
      <pub-date pub-type="epub" iso-8601-date="2026-04-06">
        <day>06</day>
        <month>04</month>
        <year>2026</year>
      </pub-date>
      <pub-date date-type="collection">
        <year>2026</year>
      </pub-date>
      <volume>18</volume>
      <issue>1</issue>
      <elocation-id>33SAVN126</elocation-id>
      <history>
        <date date-type="received" iso-8601-date="2026-02-09">
          <day>09</day>
          <month>02</month>
          <year>2026</year>
        </date>
        <date date-type="accepted" iso-8601-date="2026-03-23">
          <day>23</day>
          <month>03</month>
          <year>2026</year>
        </date>
      </history>
      <permissions>
        <copyright-year>2026</copyright-year>
        <copyright-holder xml:lang="ru">Эльмурзаев Магомед Аюбович, Алиев Саламбек Алимбекович, Муртазаев Имран Саид-Альвиевич, Умархаджиев Салаудин Мусаевич</copyright-holder>
        <copyright-holder xml:lang="en">Elmurzaev Magomed Ayubovich, Aliev Salambek Alimbekovich, Murtazaev Imran Said-Alvievich, Umarkhadzhiev Salaudin Musaevich</copyright-holder>
        <license xlink:href="https://creativecommons.org/licenses/by/4.0/">
          <license-p>CC BY 4.0</license-p>
        </license>
      </permissions>
      <self-uri xlink:type="simple" xlink:href="https://esj.today/33SAVN126.html">https://esj.today/33SAVN126.html</self-uri>
      <abstract xml:lang="ru">
        <p>Актуальность темы исследования обусловлена необходимостью повышения качества и достоверности организационно-технологического проектирования в условиях активной цифровизации строительной отрасли. Современные инвестиционно-строительные проекты характеризуются разделением информации на массивы различных форматов, что часто создает риски возникновения коллизий, потери данных и принятия ошибочных управленческих решений. В статье подробно рассматривается проблема синхронизации сведений об использовании строительных машин и механизмов, которые традиционно находятся в разрозненных средах проектирования: цифровых моделях строительных конструкций, моделях организации строительной площадки и календарно-сетевых графиках. Автором представлен новый комплексный подход к преодолению обозначенных трудностей, основанный на разработке методики структурирования данных и внедрении системы уникальных ключей связывания. Предложенное решение предполагает логическую группировку строительной техники по технологическим комплектам и индивидуальным единицам с последующим корректным заполнением атрибутивной информации в цифровых средах. Особое внимание в работе уделено практическим аспектам внедрения разработанного алгоритма. На примере реального объекта капитального строительства продемонстрирована полная работоспособность методики автоматизированного создания визуальной модели, которая объединяет пространственно-временные параметры возведения здания и динамику работы механизации. Результаты проведенного исследования подтверждают, что предложенный способ позволяет эффективно исключить расхождения между графической и текстовой документацией, а также обеспечивает возможность автоматической генерации наглядной динамической модели строительства. Это существенно повышает эффективность процессов планирования, мониторинга и контроля строительного производства, снижая вероятность проектных ошибок.</p>
      </abstract>
      <trans-abstract xml:lang="en">
        <p>The relevance of the research topic is due to the need to improve the quality and reliability of organizational and technological design in the context of active digitalization of the construction industry. Modern investment and construction projects are characterized by the separation of information into arrays of various formats, which often creates risks of collisions, data loss, and erroneous management decisions. In the article, the problem of synchronizing information on the use of construction machinery and mechanisms, which are traditionally located in disparate design environments: digital models of building structures, construction site organization models, and project schedules, is discussed in detail. The author presents a new comprehensive approach to overcoming the indicated difficulties, based on the development of a data structuring methodology and the implementation of a unique linking key system. The proposed solution involves the logical grouping of construction equipment into technological sets and individual units, followed by the correct filling of attribute information in digital environments. Special attention in the work is paid to the practical aspects of implementing the developed algorithm. Using the example of a real capital construction object, the full operability of the methodology for the automated creation of a visual model, which combines the spatiotemporal parameters of the building construction and the dynamics of mechanization work, is demonstrated. The results of the study confirm that the proposed method allows for effectively eliminating discrepancies between graphic and text documentation, and also provides the possibility of automatically generating a visual dynamic construction model. This significantly increases the efficiency of planning, monitoring, and control processes of construction production, reducing the likelihood of design errors.</p>
      </trans-abstract>
      <kwd-group xml:lang="ru">
        <title>Ключевые слова</title>
        <kwd>синхронизация данных</kwd>
        <kwd>организационно-технологическое проектирование</kwd>
        <kwd>строительные машины и механизмы</kwd>
        <kwd>цифровая информационная модель</kwd>
        <kwd>календарно-сетевой график</kwd>
        <kwd>4D-моделирование</kwd>
        <kwd>автоматизация процессов</kwd>
        <kwd>модель организации строительства</kwd>
      </kwd-group>
      <kwd-group xml:lang="en">
        <title>Keywords</title>
        <kwd>data synchronization</kwd>
        <kwd>organizational and technological design</kwd>
        <kwd>construction machinery and mechanisms</kwd>
        <kwd>digital information model</kwd>
        <kwd>project schedule</kwd>
        <kwd>4D modeling</kwd>
        <kwd>process automation</kwd>
        <kwd>construction organization model</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <back>
    <ref-list>
      <ref id="ref1">
        <label>1</label>
        <mixed-citation xml:lang="ru">Алиев, С.А. Современные нормативно-технические требования при разработке строительной цифровой информационной модели / С.А. Алиев, И.С.А. Муртазаев, М.А. Эльмурзаев // Инновации в строительстве — 2023: Материалы международной научно-практической конференции, Брянск, 06–08 апреля 2023 года / Редакционная коллегия: Н.П. Лукутцова [и др.]. — Брянск: [б.и.], 2023. — С. 93–98. — EDN WDBQJZ.</mixed-citation>
      </ref>
      <ref id="ref2">
        <label>2</label>
        <mixed-citation xml:lang="ru">Разработка научно-обоснованных требований к разработке проектов организации строительства (ПОС) с использованием технологий информационного моделирования: отчет о НИР (заключ.). Книга 1 / Национальная ассоциация инженеров-консультантов в строительстве (НАИКС); рук. К.Ю. Кузнецов; исполн.:
О.О. Кубанская [и др.]. — Москва, 2020. — 935 с. — Текст: непосредственный. — УДК 083.74. — Рег. № НИОКТР АААА-А20-120052690038-2.</mixed-citation>
      </ref>
      <ref id="ref3">
        <label>3</label>
        <mixed-citation xml:lang="ru">Karmakar, A. Automated route planning for construction site utilizing Building Information Modeling / A. Karmakar, A.R. Singh, V.S. Kumar Delhi. — DOI: 10.36680/j.itcon.2022.040 // Journal of Information Technology in Construction (ITcon). — 2022. — Т. 27. — С. 827–844.</mixed-citation>
      </ref>
      <ref id="ref4">
        <label>4</label>
        <mixed-citation xml:lang="ru">Kolaric, S. Analyzing the Level of Detail of Construction Schedule for Enabling Site Logistics Planning (SLP) in the Building Information Modeling (BIM) Environment / S. Kolaric, M. Vukomanovic, A. Ramljak. — DOI: 10.3390/su14116701 // Sustainability. — 2022. — Т. 14. — С. 6701.</mixed-citation>
      </ref>
      <ref id="ref5">
        <label>5</label>
        <mixed-citation xml:lang="ru">Каракозова, И.В. Использование «словарей» для планирования времени работы строительных машин и механизмов / И.В. Каракозова. — DOI: 10.23968/BIMAC.2022.009 // BIM-моделирование в задачах строительства и архитектуры: материалы V Международной научно-практической конференции (BIMAC 2022) / Санкт-Петербургский государственный архитектурно-строительный университет. — Санкт-Петербург, 2022. — С. 71–76.</mixed-citation>
      </ref>
      <ref id="ref6">
        <label>6</label>
        <mixed-citation xml:lang="ru">Каракозова, И.В. Создание сетевой модели на основе универсальной последовательности строительных работ / И.В. Каракозова, А.С. Павлов. — DOI: 10.22227/2305-5502.2020.3.1. // Строительство: наука и образование. — 2020. — Т. 10. — Вып. 3. — Ст. 1.</mixed-citation>
      </ref>
      <ref id="ref7">
        <label>7</label>
        <mixed-citation xml:lang="ru">Melzner, J. Automatic Generation of 4D-Schedules for reliable Construction Management / J. Melzner, J. Hanff. — Текст: электронный // Lake Constance 5D-Conference 2016 (Konstanz, 25–26 Oct. 2016). — Konstanz, 2016. — С. 112–124. — URL: https://www.researchgate.net/profile/Juergen-Melzner/publication/309538597_Automatic_Generation_of_4D-Schedules_for_reliable_Construction_Management/links/5815d5bb08aeb720f6868d13/Automatic-Generation-of-4D-Schedules-for-reliable-Construction-Management.pdf (дата обращения: 19.03.2026).</mixed-citation>
      </ref>
      <ref id="ref8">
        <label>8</label>
        <mixed-citation xml:lang="ru">Pham, K.-T. 4D-BIM-Based Workspace Planning for Temporary Safety Facilities in Construction SMEs / K.-T. Pham, D.-N. Vu, P.L.H. Hong, C. Park. — DOI: 10.3390/ijerph17103403 // International Journal of Environmental Research and Public Health. — 2020. — Т. 17, № 10. — С. 3403..</mixed-citation>
      </ref>
      <ref id="ref9">
        <label>9</label>
        <mixed-citation xml:lang="ru">Azhar, S. A BIM-based approach for communicating and implementing a construction site safety plan / S. Azhar, A. Behringer. — – DOI: 10.4324/9781003468264-11 // Building Information Modeling in Pedagogy and Practice / edited by A.K. Anderson, K.R. Miller, D.E. Gunderson. — London: Routledge, 2025.</mixed-citation>
      </ref>
      <ref id="ref10">
        <label>10</label>
        <mixed-citation xml:lang="ru">Sulankivi, K. 4D-BIM for Construction Safety Planning / K. Sulankivi, K. Kähkönen, T. Mäkelä, M. Kiviniemi. // Proceedings of W099 — Special Track 18th CIB World Building Congress (Salford, May 10–13, 2010). — Salford, 2010. — С. 117–128. — URL: https://www.researchgate.net/profile/Kristiina-Sulankivi/publication/228640694_4D-BIM_for_Construction_Safety_Planning/links/02bfe50ff850a0c2cd000000/4D-BIM-for-Construction-Safety-Planning.pdf (дата обращения: 19.03.2026).</mixed-citation>
      </ref>
      <ref id="ref11">
        <label>11</label>
        <mixed-citation xml:lang="ru">Luo, H. 4D building information modeling-enabled safety management for metro construction / H. Luo, K. Chen, X. Zhang. — DOI: 10.4337/9781839105524.00033 // Research Companion to Building Information Modeling / edited by W. Lu,
C.J. Anumba. — Cheltenham: Edward Elgar Publishing, 2022.</mixed-citation>
      </ref>
      <ref id="ref12">
        <label>12</label>
        <mixed-citation xml:lang="ru">Skjelbred, S. Comparing different approaches to site organization and logistics: multiple case studies / S. Skjelbred, M.E. Fossheim, F. Drevland. // Proceedings of the 23rd Annual Conference of the International Group for Lean Construction (IGLC-2015). — 2015. — С. 13–22. — URL: https://www.researchgate.net/profile/Maria_Mandujano/publication/333224637_IGLC-2015-Proceedingspdf/data/5ce3435d458515712eb882e7/IGLC-2015-Proceedings.pdf#page=32 (дата обращения: 19.03.2026).</mixed-citation>
      </ref>
      <ref id="ref13">
        <label>13</label>
        <mixed-citation xml:lang="ru">Bortolini, R. Site logistics planning and control using 4D modeling: a study in a lean car factory building site / R. Bortolini, J.S.I. Shigaki, C.T. Formoso.// Proceedings of the 23rd Annual Conference of the International Group for Lean Construction (IGLC). — 2015. — С. 361–370. — URL: https://www.researchgate.net/profile/Maria_Mandujano/publication/333224632_IGLC_23_Global_Problems-_Global_Solutions/links/5ce340b1299bf14d95abac2b/IGLC-23-Global-Problems-Global-Solutions.pdf#page=380 (дата обращения: 19.03.2026).</mixed-citation>
      </ref>
      <ref id="ref14">
        <label>14</label>
        <mixed-citation xml:lang="ru">Cheng, J.C.P. A BIM-based framework for material logistics planning / J.C.P. Cheng, S. Kumar. // Proceedings of the 23rd Annual Conference of the International Group for Lean Construction (IGLC-23). — Perth, 2015. — С. 33–42. — URL: https://www.researchgate.net/profile/Maria_Mandujano/publication/333224637_IGLC-2015-Proceedingspdf/data/5ce3435d458515712eb882e7/IGLC-2015-Proceedings.pdf#page=52 (дата обращения: 19.03.2026).</mixed-citation>
      </ref>
      <ref id="ref15">
        <label>15</label>
        <mixed-citation xml:lang="ru">Singh, A.R. Optimizing Site Layout Planning utilizing Building Information Modelling / A.R. Singh, Y. Patil, V.S.K. Delhi. — DOI 10.22260/ISARC2019/0051 // Proceedings of the 36th International Symposium on Automation and Robotics in Construction (ISARC). — 2019. — С. 376–383.</mixed-citation>
      </ref>
      <ref id="ref16">
        <label>16</label>
        <mixed-citation xml:lang="ru">Trani, M.L. Construction site BIM requirements / M.L. Trani, M. Cassano, M. Minotti, D. Todaro.// Proceedings of the 30th Annual ARCOM Conference / ed. by A.B. Raiden, E. Aboagye-Nimo. — Portsmouth: Association of Researchers in Construction Management, 2014. — С. 663–672. — URL: https://www.arcom.ac.uk/-docs/proceedings/ar2014-0663-0672_Trani_Cassano_Minotti_Todaro.pdf (дата обращения: 19.03.2026).</mixed-citation>
      </ref>
      <ref id="ref17">
        <label>17</label>
        <mixed-citation xml:lang="ru">Sheina, S. 4D BIM for Construction Planning and Environmental Planning / S. Sheina, E. Seraya, V. Krikunov, N. Saltykov. — DOI 10.1051/e3sconf/201911001012 // E3S Web of Conferences. — 2019. — Т. 110. — С. 01012.</mixed-citation>
      </ref>
      <ref id="ref18">
        <label>18</label>
        <mixed-citation xml:lang="ru">Богданова О.В., Докудовская Д.И. Инновационные методы 4D моделирования в организации строительства // ИВД. 2018. № 2(49). URL: https://cyberleninka.ru/article/n/innovatsionnye-metody-4d-modelirovaniya-v-organizatsii-stroitelstva (дата обращения: 19.03.2026).</mixed-citation>
      </ref>
      <ref id="ref19">
        <label>19</label>
        <mixed-citation xml:lang="ru">Болотин, С.А. Методика визуализации календарного планирования в программе Autodesk Revit 2018 / С.А. Болотин, Х.В. Биче-Оол, А.К.Х. Дадар — DOI 10.23968/1999-5571-2019-16-6-179-185. // Вестник гражданских инженеров. — 2019. — № 6(77). — С. 179–185 — EDN NDAPXS.</mixed-citation>
      </ref>
      <ref id="ref20">
        <label>20</label>
        <mixed-citation xml:lang="ru">Caldart, C.W. Construction site design planning using 4D BIM modeling /
C.W. Caldart, S. Scheer. — DOI 10.1590/1806-9649-2022v29e5312 // Gestão &amp; Produção. — 2022. — Т. 29. — С. e5312.</mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>
