        <journal-title xml:lang="ru">Вестник Евразийской науки</journal-title>
        <journal-title xml:lang="en">The Eurasian Scientific Journal</journal-title>
      </journal-title-group>
      <publisher>
        <publisher-name>ООО «Издательство «Мир науки»</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="uri">https://esj.today/69SAVN225.html</article-id>
      <title-group>
        <article-title xml:lang="ru">Календарно-сетевое планирование в строительстве
с применением информационного моделирования на примере «Пружинной диаграммы»</article-title>
        <trans-title-group xml:lang="en">
          <trans-title>Scheduling in construction using building information modeling on the example of The Spring Chart technique</trans-title>
        </trans-title-group>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <name name-style="eastern">
            <surname>Ундозеров</surname>
            <given-names>Вадим Андреевич</given-names>
          </name>
          <name-alternatives>
            <name xml:lang="ru" name-style="eastern">
              <surname>Ундозеров</surname>
              <given-names>Вадим Андреевич</given-names>
            </name>
            <name xml:lang="en" name-style="western">
              <surname>Undozerov</surname>
              <given-names>Vadim Andreevich</given-names>
            </name>
          </name-alternatives>
          <email>und-vadim@yandex.ru</email>
          <contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-1094-4553</contrib-id>
          <xref ref-type="aff" rid="aff1"/>
        </contrib>
        <aff-alternatives id="aff1">
          <aff>
            <institution xml:lang="ru">ФГБОУ ВО «Национальный исследовательский Московский государственный строительный университет» (Москва, Россия)</institution>
          </aff>
          <aff>
            <institution xml:lang="en">Moscow State University of Civil Engineering (National Research University) (Moscow, Russia)</institution>
          </aff>
        </aff-alternatives>
      </contrib-group>
      <pub-date pub-type="epub" iso-8601-date="2025-06-26">
        <day>26</day>
        <month>06</month>
        <year>2025</year>
      </pub-date>
      <pub-date date-type="collection">
        <year>2025</year>
      </pub-date>
      <volume>17</volume>
      <issue>2</issue>
      <elocation-id>69SAVN225</elocation-id>
      <history>
        <date date-type="received" iso-8601-date="2025-04-23">
          <day>23</day>
          <month>04</month>
          <year>2025</year>
        </date>
        <date date-type="accepted" iso-8601-date="2025-06-10">
          <day>10</day>
          <month>06</month>
          <year>2025</year>
        </date>
      </history>
      <permissions>
        <copyright-year>2025</copyright-year>
        <copyright-holder xml:lang="ru">Ундозеров Вадим Андреевич</copyright-holder>
        <copyright-holder xml:lang="en">Undozerov Vadim Andreevich</copyright-holder>
        <license xlink:href="https://creativecommons.org/licenses/by/4.0/">
          <license-p>CC BY 4.0</license-p>
        </license>
      </permissions>
      <self-uri xlink:type="simple" xlink:href="https://esj.today/69SAVN225.html">https://esj.today/69SAVN225.html</self-uri>
      <abstract xml:lang="ru">
        <p>В статье рассмотрена проблема реализации функции календарно-сетевого планирования возведения объектов капитального строительства в системах информационного моделирования. Актуальность проблемы связана с растущей потребностью строительной отрасли в развитии подходов к управлению сроками строительства с применением современных информационных технологий. Рассмотрено понятие информационного моделирования, описан лежащий в его основе дата-центрический подход, перечислены преимущества применения технологий информационного моделирования по сравнению с традиционным подходом к управлению информацией в инвестиционно-строительных проектах. Описано применение технологий информационного моделирования на примере системы Multi-D, разработанной Госкорпорацией Росатом для управления информацией в проектах строительства атомных электростанций. В результате обзора отечественной и зарубежной научной литературы выявлено, что существующая теоретическая и практическая база внедрения технологий информационного моделирования на этапе возведения объектов капитального строительства развита недостаточно. Одним из ключевых вопросов в управлении сроками строительства является совершенствование методов визуализации календарно-сетевых планов для реализации динамического управления сроками (управления изменениями в плане). Динамическое управление сроками повышает адаптивность строительной системы, эффективность ее функционирования. Рассмотрен опыт Госкорпорации Росатом по управлению сроками с применением технологий информационного моделирования. Представлена разработанная автором методика визуализации календарно-сетевых планов («Пружинная диаграмма»), представляющая собой модификацию диаграммы Гантта, адаптированную для визуализации изменений относительно изначального плана. Описано Web-приложение для реализации методики. Указано на необходимость интеграции «Пружинной диаграммы» в системы информационного моделирования для дальнейшего развития применения методики.</p>
      </abstract>
      <trans-abstract xml:lang="en">
        <p>The problem of implementing scheduling in construction within the framework of information modeling systems (BIM) is discussed. The relevance of the problem is related to the growing need of the construction industry to develop approaches for managing construction schedules using modern information technologies. The concept of information modeling is considered, the underlying data-centric approach is described, and the advantages of using BIM in comparison with the traditional project information management approach are listed. The application of information modeling technologies is described using the example of the Multi-D system developed by Rosatom State Corporation for information management in nuclear power plant construction projects. As a result of the scientific literature review, it was revealed that the existing theoretical and practical basis for the introduction of BIM at the stage of construction of capital construction facilities is not sufficiently developed. One of the key issues in construction time management is the improvement of visualization techniques for dynamic scheduling. Dynamic scheduling increases the adaptability and efficiency of construction system. The experience of the Rosatom State Corporation in scheduling using information modeling is considered. The author presents a visualization technique for dynamic scheduling («the Spring Chart»), which is a modification of the Gantt chart adapted to visualize changes relative to the initial plan. A Web application for the implementation of the technique is described. It is pointed out that it is necessary to integrate the «Spring Chart» into information modeling systems (4D-BIM) for further development of the application of the technique.</p>
      </trans-abstract>
      <kwd-group xml:lang="ru">
        <title>Ключевые слова</title>
        <kwd>информационное моделирование</kwd>
        <kwd>4D-building information modeling</kwd>
        <kwd>технологии информационного моделирования</kwd>
        <kwd>календарно-сетевое планирование</kwd>
        <kwd>динамическое управление сроками</kwd>
        <kwd>управление проектами</kwd>
        <kwd>информационные технологии в строительстве</kwd>
      </kwd-group>
      <kwd-group xml:lang="en">
        <title>Keywords</title>
        <kwd>information modeling</kwd>
        <kwd>building information modeling</kwd>
        <kwd>4D-BIM</kwd>
        <kwd>scheduling</kwd>
        <kwd>dynamic scheduling</kwd>
        <kwd>project management</kwd>
        <kwd>rescheduling</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <back>
    <ref-list>
      <ref id="ref1">
        <label>1</label>
        <mixed-citation xml:lang="ru">Чурбанов А.Е. Влияние технологии информационного моделирования на развитие инвестиционно-строительного процесса / А.Е. Чурбанов, Ю.А. Шамара // Вестник МГСУ. — 2018. — Т. 13. Вып. 7 (118). — С. 824–835.</mixed-citation>
      </ref>
      <ref id="ref2">
        <label>2</label>
        <mixed-citation xml:lang="ru">Кузнецов Б.О. Развитие комплексного инжиниринга в строительстве на технологической платформе информационного моделирования / Б.О. Кузнецов // Вестник гражданских инженеров. — 2020. — № 2(79). — С. 230–238.</mixed-citation>
      </ref>
      <ref id="ref3">
        <label>3</label>
        <mixed-citation xml:lang="ru">Топчий, Д.В. Концепция контроля качества организации строительных процессов при проведении строительного надзора на основе использования информационных технологий / Д.В. Топчий, А.Я. Токарский // Вестник евразийской науки. — 2019. — Т. 11, № 3. — С. 49. — EDN BWLDSN.</mixed-citation>
      </ref>
      <ref id="ref4">
        <label>4</label>
        <mixed-citation xml:lang="ru">Иванченко, В.В. Совершенствование процессов организации строительства объекта недвижимости на основе технологий информационного моделирования / В.В. Иванченко, Т.В. Добышева // Молодежный вестник ИрГТУ. — 2022. — Т. 12, № 4. — С. 734–738. — EDN IXWQAM.</mixed-citation>
      </ref>
      <ref id="ref5">
        <label>5</label>
        <mixed-citation xml:lang="ru">Aredah A.S., Baraka M.A., ElKhafif M. Project scheduling techniques within a building information modeling (BIM) environment: A survey study // IEEE Engineering Management Review. — 2019. — Т. 47. — №. 2. — С. 133–143.</mixed-citation>
      </ref>
      <ref id="ref6">
        <label>6</label>
        <mixed-citation xml:lang="ru">Olivieri H., Seppänen O., Denis Granja A. Improving workflow and resource usage in construction schedules through location-based management system (LBMS) // Construction management and economics. — 2018. — Т. 36. — №. 2. — С. 109–124.</mixed-citation>
      </ref>
      <ref id="ref7">
        <label>7</label>
        <mixed-citation xml:lang="ru">Huseynov M. Optimization methods for construction schedules to enhance project efficiency // The American Journal of Engineering and Technology. — 2025. — Т. 7. — № 02. — С. 12–17.</mixed-citation>
      </ref>
      <ref id="ref8">
        <label>8</label>
        <mixed-citation xml:lang="ru">Purushothaman M.B. et al. Dynamic scheduling: influential and influenced factors and their interrelationships in the New Zealand construction industry //Smart and Sustainable Built Environment. — 2025.</mixed-citation>
      </ref>
      <ref id="ref9">
        <label>9</label>
        <mixed-citation xml:lang="ru">Lengler, R. Towards A Periodic Table of Visualization Methods for Management /
R. Lengler, M.J. Eppler // In Proceedings of Graphics and Visualization in Engineering (GVE 2007), Clearwater, Florida, USA. — ACTA Press.: 2007. — 6 p.</mixed-citation>
      </ref>
      <ref id="ref10">
        <label>10</label>
        <mixed-citation xml:lang="ru">Феррейра Опасо, Е.В. Обзор способов визуализации многомерных данных /
Е.В. Феррейра Опасо // Альманах современной науки и образования. — 2014. — № 7(85). — С. 141–146.</mixed-citation>
      </ref>
      <ref id="ref11">
        <label>11</label>
        <mixed-citation xml:lang="ru">Колычев, В.Д. Система визуальных моделей управления проектами /
В.Д. Колычев, В.П. Румянцев // Научная визуализация. — 2014. — Т. 6. № 3. — С. 14–54.</mixed-citation>
      </ref>
      <ref id="ref12">
        <label>12</label>
        <mixed-citation xml:lang="ru">Kermanshachi, S. Discovering the impact of late change orders and rework on labor productivity: a water treatment case study analysis using system dynamics modeling / S. Kermanshachi, R. Thakur, P. Govan // Proceedings of Construction Research Congress, New Orleans, Louisiana, April 2–4. — 2018. — Pp. 691–701.</mixed-citation>
      </ref>
      <ref id="ref13">
        <label>13</label>
        <mixed-citation xml:lang="ru">Eden, C. On the nature of disruption and delay (D&amp;D) in major projects / C. Eden, T. Williams, F. Ackermann, S. Howick // Journal of Operational Research Society. — 2000. — V. 51(3). — Pp. 291–300.</mixed-citation>
      </ref>
      <ref id="ref14">
        <label>14</label>
        <mixed-citation xml:lang="ru">Taylor, T. Why good projects go bad: Managing development projects near tipping points / T. Taylor, D. Ford, S. Johnson // In Proceedings of the 23th International Conference of the System Dynamics Society, Boston, MA, 17– 21 July. — 2005. — 39 p.</mixed-citation>
      </ref>
      <ref id="ref15">
        <label>15</label>
        <mixed-citation xml:lang="ru">Liu, S.-S. Construction rescheduling based on a manufacturing rescheduling framework / S.-S. Liu, K.-C. Shin // Automation in Construction. — 2009. — V. 18(6). — Pp. 715–723.</mixed-citation>
      </ref>
      <ref id="ref16">
        <label>16</label>
        <mixed-citation xml:lang="ru">Yap, J.B.H. Design change dynamics in building project: from literature review to a conceptual framework formulation / J.B.H. Yap, H. Abdul-Rahman, Chen Wang // Journal of Surveying, Construction &amp; Property. — 2017. — V. 8(1). — Pp. 13–33.</mixed-citation>
      </ref>
      <ref id="ref17">
        <label>17</label>
        <mixed-citation xml:lang="ru">Olawale, Y. Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice / Y. Olawale, M. Sun // Construction Management and Economics. — 2010. — V. 28(5). — Pp. 509–526.</mixed-citation>
      </ref>
      <ref id="ref18">
        <label>18</label>
        <mixed-citation xml:lang="ru">Anderson, P. Complexity theory and Organization science / P. Anderson // Organization Science. — 1999. — V. 10(3). — Pp. 216–232.</mixed-citation>
      </ref>
      <ref id="ref19">
        <label>19</label>
        <mixed-citation xml:lang="ru">Ундозеров, В.А. Модификация диаграммы Гантта для улучшения визуализации процессов при изменениях в плане / В.А. Ундозеров // Вестник Казанского государственного технического университета имени А.Н. Туполева. — 2020. — Т. 76, № 4. — С. 52–56. — EDN AFLFEE.</mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>